Search by

jaydeep / laravel-time-machine

JaydeepGadhiya

Inspect, profile and visualize every stage of the Laravel request lifecycle — from bootstrapping to response — with detailed execution timelines and performance insights.

Package info

github.com/JaydeepGadhiya/laravel-timemachine

pkg:composer/jaydeep/laravel-time-machine

Statistics

Installs: 7 689

Dependents: 0

Suggesters: 0

Stars: 74

Open Issues: 0

v1.1.0 2026-08-10 07:15 UTC

This package is auto-updated.

Last update: 2026-10-23 00:59:16 UTC


README

Profile, debug and visualize every Laravel request — from framework boot to response — with a millisecond-accurate Gantt timeline, full SQL query profiling and a beautiful zero-config dashboard.

Latest Version on Packagist MadeWithLaravel.com shield Total Downloads PHP Version Laravel 8 to 13 License: MIT

Laravel Time Machine is a lightweight, drop-in Laravel performance profiler and request debugger. It answers one simple question that every developer asks — "Where did all the time go in this request?" — by breaking down the complete request lifecycle into a clear, interactive timeline. Find slow queries, N+1 problems, heavy middleware and sluggish controllers in seconds, without adding a single line of setup code.

If this package saves you some debugging time, kindly ⭐ star the repository — it really helps others discover it too!

Request list — all your recent requests with duration, query count, memory and status, at one glance:

Laravel Time Machine dashboard - request list with performance metrics

Request detail — a Gantt-style lifecycle timeline along with every database query:

Laravel Time Machine request detail - Gantt timeline and SQL query profiling

📑 Table of Contents

🤔 Why Laravel Time Machine?

Debugging slow Laravel requests usually means guessing, adding random microtime() calls, or setting up a heavy monitoring stack. Laravel Time Machine gives you the full picture instantly:

  • ✅ Zero configuration — install and it just works. No service registration, no asset build, no external service.
  • ✅ See the whole lifecycle — boot, middleware, routing, controller, response and terminate, each measured to the millisecond.
  • ✅ Catch slow & N+1 queries — every SQL statement is captured with bindings, connection and duration, and slow ones are highlighted automatically.
  • ✅ Self-hosted & private — profiles are stored as plain JSON files in your own storage/ folder. Nothing leaves your server.
  • ✅ Production-safe — completely off unless you switch it on, so there is zero overhead when disabled.

Perfect for: optimizing slow endpoints, hunting N+1 queries, understanding a new codebase, teaching how Laravel handles a request, and profiling APIs during development.

✨ Features

  • 🧭 Full lifecycle timeline — Bootstrap & Boot → Middleware & Routing → Controller & Response → Terminate, each one measured upto the millisecond.
  • 🗄 Query profiling — every single SQL statement is captured with its bindings, connection, offset on the timeline and duration (slow queries are highlighted for you).
  • 📌 Custom spans & marks — instrument your own code using just a one-line facade.
  • 📊 Visual dashboard — a self-contained web UI that lists your recent requests with a Gantt-style timeline detail view. No asset compilation is required, it works out of the box.
  • 🔎 Filter & search requests — narrow the request list down by HTTP method, URL pattern, status code and duration, so you can jump straight to the slow endpoint you are chasing.
  • 🧠 Performance insights — total time, peak memory, query count/time and slow-request flagging, all in one place.
  • 🪶 Zero overhead when disabled — it stays off in production by default, so nothing gets recorded and nothing gets rendered.

📦 Installation

Require the package via Composer:

composer require jaydeep/laravel-time-machine

The service provider and the TimeMachine facade get auto-discovered, so no manual registration is needed. If you want to tune the settings, publish the config file:

php artisan vendor:publish --tag=time-machine-config

That's it. You are good to go. 🎉

🚀 Usage

By default, Time Machine remains active whenever APP_DEBUG=true. Just browse your app as usual and then open the dashboard:

http://your-app.test/time-machine

Every non-ignored HTTP request is recorded automatically — you don't have to do anything extra. Click on any request to see its full lifecycle timeline, queries and marks.

Filtering requests

Once you have a few hundred profiles recorded, scrolling through them is no fun. The dashboard therefore ships with a filter bar right above the request list:

Laravel Time Machine dashboard - filter requests by HTTP method, URL pattern, status code and duration

Filter Accepts Example
Method Any one of GET, POST, PUT, PATCH, DELETE, HEAD, OPTIONS POST
URL pattern A URI, with * wildcards allowed /api/users/*
Status An HTTP status code between 100 and 599 500
Duration (ms) >= or <= together with a value in milliseconds >= 500

A few things worth knowing:

  • The filters combine — give it a method and a URL pattern and a duration and only the profiles matching all of them are shown.
  • URL matching is wildcard-based, exactly like Laravel's own Str::is(), so /api/* matches every API route while /api/users matches just that one.
  • The stat cards follow your filter — request count, average duration, slowest request and total queries are all recalculated for the filtered set, not just the current page. This makes it very easy to answer questions like "how slow is my /api/orders/* endpoint on average?".
  • The filters survive pagination — they are appended to the pagination links, so page 2 keeps showing the same filtered set.
  • Everything is shareable and bookmarkable, since the filters live in the query string:
http://your-app.test/time-machine?method=GET&url=/api/users/*&duration_operator=gte&duration=500

Hit Reset filters to clear everything and get back to the full list.

Instrument your own code

Want to profile a specific portion of your code? The same can be done easily using the facade:

use Jaydeep\LaravelTimeMachine\Facades\TimeMachine;

// Drop a marker on the timeline
TimeMachine::mark('cache primed');

// Time a block of code as a span
$report = TimeMachine::measure('generate-report', function () {
    return Report::build();
});

// Or open and close it manually
TimeMachine::startSpan('external-api');
$response = Http::get('https://api.example.com');
TimeMachine::endSpan('external-api');

⚙️ Configuration

All the settings live in config/time-machine.php (env keys are given in brackets):

Key Default Purpose
enabled [TIME_MACHINE_ENABLED] follows APP_DEBUG Master on/off switch
dashboard.path [TIME_MACHINE_PATH] time-machine Dashboard URI prefix
dashboard.middleware ['web'] Guards the dashboard (add auth in production)
dashboard.per_page [TIME_MACHINE_PER_PAGE] 15 Requests listed per page on the dashboard
storage.max_records [TIME_MACHINE_MAX_RECORDS] 100 Profiles retained (oldest ones are pruned)
storage.path storage/time-machine Where the profiles are written
collectors.queries true Capture DB queries
ignore_paths assets, telescope… Paths that are never profiled (wildcards allowed)
thresholds.slow_request / slow_query 500 / 50 ms Used for UI highlighting

Production tip: In case you enable it in production, lock down the dashboard with an auth middleware via dashboard.middleware. Otherwise your profiling data will be exposed to everyone, which we don't want.

🔍 How it works

Internally, Time Machine anchors the whole timeline to the start of the request — LARAVEL_START under PHP-FPM — and then records the phase boundaries from various framework hooks and events:

  • LARAVEL_START → boot start
  • Application::booted() → providers booted
  • RouteMatched event → routing complete
  • RequestHandled event → response ready
  • A prepended global middleware's terminate() → request finished, profile persisted

The queries are captured via the QueryExecuted event. After that, everything is flattened into millisecond offsets and stored as one JSON file per request. Simple and clean.

Octane, Swoole & other persistent workers

On a persistent runtime one PHP process serves many requests, so LARAVEL_START is the worker's boot time rather than the request's. Time Machine handles this for you:

  • The recorder is a scoped binding (a singleton on Laravel 8), so each request gets its own, and Octane's RequestReceived / RequestTerminated events reset it either way.
  • The timeline is re-anchored to the start of each request, so total_ms is the request's duration, never the worker's uptime.
  • Because a reused worker does not bootstrap the framework again, the Bootstrap & Boot segment reads 0 ms on every request after the first one on that worker. That is expected, not a missing measurement.
  • Memory is measured per request via memory_reset_peak_usage() on PHP 8.2+; on older versions it falls back to the net usage growth, since a true per-request peak is not observable there.

Nothing to configure — and no need to add the recorder to Octane's flush config.

🆚 Time Machine vs Telescope vs Debugbar

Laravel Time Machine Laravel Telescope Laravel Debugbar
Full lifecycle Gantt timeline ✅ ❌ ❌
Zero config / no asset build ✅ ❌ ✅
Database (no DB tables needed) ✅ (JSON files) ❌ (needs migrations) ✅
Per-request query profiling ✅ ✅ ✅
Self-hosted & private ✅ ✅ ✅
Lightweight footprint ✅ Heavy Medium

Time Machine is intentionally focused: it does request lifecycle profiling extremely well, without the weight of a full monitoring suite.

❓ FAQ

Does it slow down my application? No. When disabled it records nothing and adds virtually zero overhead. It is off in production by default.

Do I need a database or migrations? Not at all. Profiles are stored as plain JSON files under storage/time-machine, so there is nothing to migrate.

Is it safe to run in production? Yes, but keep it disabled unless you are actively debugging, and always protect the dashboard with an auth middleware if you do enable it.

Can I search or filter the recorded requests? Yes. The dashboard has a filter bar for HTTP method, URL pattern (wildcards supported), status code and duration. The filters combine, they are reflected in the stat cards, and they stay applied while you paginate. See Filtering requests.

Does it work with Laravel Octane / RoadRunner / Swoole? Yes, from v1.1 onwards. Persistent workers need per-request state handling, which Time Machine does automatically — see Octane, Swoole & other persistent workers. If you are on v1.0 and see durations in the millions of milliseconds, upgrade.

Which Laravel and PHP versions are supported? Every Laravel version from 8 right up to the latest 13, on PHP 7.4 and 8.x. (Do note that Laravel 11+ needs PHP 8.2+ and Laravel 13 needs PHP 8.3+, as per Laravel's own requirements.)

✅ Requirements

  • PHP 7.4+ / 8.x
  • Laravel 8, 9, 10, 11, 12 or 13 (the latest)

🤝 Contributing

Contributions, bug reports and feature requests are most welcome! In case you face any issue or have some suggestion, kindly open an issue or send a pull request, and I will surely revert back.

If you find this package useful, please consider ⭐ starring the repo and sharing it with fellow Laravel developers — it goes a long way in helping the project grow.

🙏 Credits

📄 License

MIT © Jaydeep Gadhiya

Keywords: laravel profiler · laravel performance · laravel request lifecycle · laravel debugging · laravel query profiler · laravel timeline · laravel debug bar alternative · laravel telescope alternative · php performance profiling · slow query detection · n+1 query detection